July 2024 l First Crane Installed at 65-Story Tower Construction Site

July 2024 l First Crane Installed at 65-Story Tower Construction Site

A tower crane has been installed at the construction site of E11EVEN Residences Beyond in Park West.

Currently, two 65-story E11EVEN towers are rising on the same block, with the first tower already approximately halfway up.

E11EVEN Residences Beyond, where the new crane has just been installed, will include:

558 residential units

7,119 square feet for a bar/cocktail lounge/nightclub

21,611 square feet of retail space

Groundbreaking for E11EVEN Residences Beyond took place in June 2023, following developers PMG and E11EVEN Partners securing a $262 million construction loan.

Construction is also ongoing for the first tower, called E11EVEN Hotel & Residences.

Renderings of E11EVEN Residences Beyond are available.

 

Please contact Miami Real Estate Agent, David Freed for all of your Brickell and Miami real estate services

Have real estate questions or need tailored advice in Miami? Contact David Freed for professional insights and personalized services. 

July 2024 l First Crane Installed at 65-Story Tower Construction Site
July 2024 l First Crane Installed at 65-Story Tower Construction Site
July 2024 l First Crane Installed at 65-Story Tower Construction Site
July 2024 l First Crane Installed at 65-Story Tower Construction Site
July 2024 l First Crane Installed at 65-Story Tower Construction Site
July 2024 l First Crane Installed at 65-Story Tower Construction Site
July 2024 l First Crane Installed at 65-Story Tower Construction Site
July 2024 l First Crane Installed at 65-Story Tower Construction Site
July 2024 l First Crane Installed at 65-Story Tower Construction Site
July 2024 l First Crane Installed at 65-Story Tower Construction Site

WITH

Trustworthy. Dedicated. Dependable. David Freed has over 26 years of customer service excellence and has amassed a renowned class of clientele and unmatched experience.